Search for the PMP passing score and you will find confident numbers everywhere: 61%, 65%, "around 70%". None of them come from PMI. The organisation that runs the exam has never published a percentage for the current PMP, and its own handbook explains why: the exam is scored against a standard of competence, not against a fixed number of correct answers.

That can feel unsatisfying when you are trying to plan your study. This guide explains what PMI does say, how this kind of scoring works in plain English, how to read your score report, and how to set a sensible target on practice tests.

FactDetail
Official pass markNot published
How results are reportedPass or fail, plus a rating per domain
Scored questions170 of 180 (10 unscored pretest)
Scoring basisPsychometric analysis against a defined standard
Official reportAvailable online within 10 business days
AttemptsUp to 3 within a 1-year eligibility period
Mock target (MockDen guidance)75% or higher on full timed mocks

What PMI actually says

The PMI Certification Handbook (revised June 2026) describes its exams as "criteria-based". In short, PMI first defines what a qualified person in the role should be able to do, which for the PMP is an experienced project manager. The passing score is then set by psychometric analysis so that candidates who meet that standard pass and those who do not, fail.

The handbook also makes three practical points.

  • You are evaluated only on scored items. The July 2026 outline confirms that 10 of the 180 questions are unscored pretest items, mixed in at random.
  • Each question is treated as a sample of your proficiency. PMI gathers information from all of them to judge your overall level and compare it with the standard.
  • Any result you see at the end of your session is preliminary until PMI confirms it. The official report is available in the online results system no later than 10 business days after the exam.
On the exam

The pass or fail decision is made on the whole exam. You will see a rating for each domain, but there is no separate pass mark per domain in PMI's published material.

Psychometric scoring in plain English

Imagine two candidates who each answer 120 of 170 scored questions correctly. Under a simple percentage system they would get the same result. Under psychometric scoring they might not, because the questions are not all equal.

Here is the idea, without the statistics.

  1. Every question is pretested. Before a question counts towards anyone's score, it appears as an unscored pretest item. PMI collects data on how candidates answer it.
  2. Questions get a difficulty profile. From that data PMI can tell how hard each question is and how well it separates strong candidates from weak ones.
  3. A standard is set by experts. Subject matter experts decide what level of performance represents a qualified project manager. That standard is fixed in terms of ability, not in terms of a raw count.
  4. Your answers are compared with the standard. Because different candidates get different forms with different question mixes, the number of correct answers needed can vary slightly from form to form, so that the bar stays equally high whichever form you get.

This is why PMI cannot honestly publish a single percentage. If your form happens to contain slightly harder questions, you may need a few fewer correct answers to show the same ability. A fixed percentage would make the exam less fair, not more.

Note

Percentages that circulate online usually trace back to much older versions of the exam or to guesswork. PMI's current handbook gives no percentage, so none of them can be relied on for today's exam.

The performance ratings

Your score report gives an overall pass or fail and a rating for each domain. PMI's sample result report describes four ratings.

RatingWhat PMI means by it
Above TargetYour performance exceeded the minimum standard
TargetYour performance met the minimum standard
Below TargetYou were slightly short of the standard; more preparation is advised
Needs ImprovementYou were well short of the standard; more preparation is strongly advised

The sample report PMI hosts is an older document, so the layout of your own report may look different. Use the descriptions on your own report if they differ from the table above.

Why vendor percentages differ so much

If PMI does not publish a pass mark, where do the numbers online come from? Usually one of three places.

  • Old information. Figures that were published or rumoured years ago keep being repeated after the scoring model changed.
  • Guesswork from score reports. Candidates share their domain ratings, and people try to reverse-engineer a percentage. Because forms differ and ratings are bands, this cannot produce a reliable number.
  • Each vendor's own question bank. A prep provider may say "score 70% on our tests and you will pass". That is a statement about their questions, which may be easier or harder than the real exam. It is not a statement about PMI's standard.
Exam trap

Do not treat a vendor's pass threshold as the PMP pass mark. A percentage only means something relative to the difficulty of the questions it was measured on.

A sensible mock benchmark

Since there is no official number to aim at, you need a target that gives you a margin of safety. As MockDen's own guidance, which is not a PMI rule, we suggest:

  • 75% or higher on full-length, timed mocks built on the July 2026 outline.
  • Two consecutive full mocks at that level, not one lucky result.
  • No weak domain. If People and Process are at 80% but Business Environment is at 60%, you are not ready yet. That domain is now 26% of the exam.
  • First attempts only. Retaking the same mock inflates your score because you remember the answers. Judge readiness on questions you have not seen before.

Why 75%? Because it leaves room for the extra pressure of exam day, unfamiliar question formats and harder case study sets. It is a planning target, not a prediction of your real result.

Tip

Track your score by domain, not just overall. A steady overall score can hide one domain dragging you down, and the score report will show it even if your total looks fine.

Reading your report after the exam

If you passed, look at your domain ratings anyway. A Below Target rating in one domain tells you where to focus your professional development, and your 60 PDUs over the next three years are a good place to fix it.

If you did not pass, the domain ratings are your study plan. Start with any domain rated Needs Improvement, then Below Target. Do not throw away domains rated Target; they are at the line, and a different form could push them either way. Re-read the relevant tasks and enablers in the official outline, then do focused practice before attempting another full mock.

Retake rules

The July 2026 outline and the PMI Certification Handbook set out the retake policy.

  • You have a one-year eligibility period to pass.
  • You can sit the exam up to three times in that period. The handbook says fees apply again for the second and third attempts, and PMI prices vary by membership and region.
  • After three unsuccessful attempts, you must wait one year from the date of your last exam before reapplying for the PMP. You may apply for other PMI certifications during that year.
  • If your eligibility period ends before you pass, even with attempts left, you need to reapply, but no waiting period applies.

Check the current fees on pmi.org when you book, as PMI sets them by membership status and region.

Build your margin before you book

The absence of a published pass mark is not a trick. It reflects a fair way of comparing candidates who sit different versions of the exam. Your job is to prepare to the standard, comfortably clear of it, in every domain. MockDen's PMP mock exams report your score by domain and give you a readiness score so you can see where your margin is thin. MockDen is independent and not affiliated with PMI, and its questions are original practice items written to the official outline. Try the free practice set to get your first baseline.

Last checked against official sources on 19 November 2026.

Frequently asked questions

What is the PMP passing score?

PMI does not publish one. Its handbook says the passing score is set by psychometric analysis against the standard expected of a qualified project manager, and results are reported as pass or fail.

Is the PMP pass mark 61%?

There is no official source for 61% or any other percentage on the current exam. Figures like this circulate online but PMI has not confirmed them, so treat them as rumour.

What do Above Target and Needs Improvement mean?

They are performance ratings PMI uses on score reports. Above Target means you exceeded the minimum standard, Target means you met it, Below Target means you were slightly short and Needs Improvement means you were well short.

How many times can I retake the PMP?

You can sit the exam up to three times within your one-year eligibility period. Retakes carry a fee. After three unsuccessful attempts you must wait one year from your last exam before reapplying.

What mock score means I am ready?

As MockDen guidance, not a PMI rule, aim for 75% or higher on at least two full timed mocks built on the current outline, with no domain far below the others.

Sources

MockDen is independent and not affiliated with the exam owners. Always confirm fees and dates on the official page before booking.

Put it into practice

Find out where you stand in 20 minutes

Take the free diagnostic for PMP, then let MockDen build a study plan around your weak spots.

Keep reading